Loop 01 · Price · Agentic CPQ

Every quote, underwritten.

Configure against your real installed cost, price against a floor that holds, and issue the quote with a deal room attached — priced from live cost, gated on your approval. Margin enforced at the address, before the job starts.

Book a demo → the CPQ flagship Sits on your CRM · ERP · FSM
POST /v1/quotes 200 OK · 38ms
Apex Networks · Campus East
MDU rollout — 12 sites
$42,35014 SKUs
DCFC-150 · charger×12$21,600
TRENCH · civil work142 m$11,360
LABOR · crew 0438 hrs$6,840
SVC · 24mo monitoring×12$2,550
34.2%Margin
Cost model live · ERP + FSM
Floor 28.0% · headroom +6.2 pts
Deal room issued · e-sign sent
Approved · above floor
Per line
Floor held
server-side
\$300K
Surfaced in one
90-day sweep
38ms
Signal to
scored quote
\$100K
Captured in the
first sweep
Design-partner rollout · in production
1 DP · in production 3 more · in negotiation \$300K · surfaced in 90 days Made in Montréal
The stakes · Margin leakage

Every CPQ built since 1990 discovers margin at month-end.

Sales sets an ambition. Ops scrambles to deliver it. Finance finds out what it cost after the crew has gone home. Allometry inverts the arrow — the physical teaches the commercial.

✗ Before Allometry
  • Quotes priced from a spreadsheet with a 6-month-stale cost model
  • Discount creep is invisible until the quarter closes
  • Cost-to-serve unknown at the address — only at the account
  • Hours every week reconciling CRM against ERP against field
✓ With Allometry
  • Every quote scored against a live cost model — ERP + FSM
  • The margin floor is enforced before send, not audited after
  • Realized margin visible per address, continuously
  • 50+ quotes/day issued autonomously, each above floor
Measured
\$300K surfaced at one operator, in 90 days.
Hours
Per week lost to reconciliation that shouldn't exist.
Real-time
When you learn the margin, instead of at month-end.
Step 01 · Configure

Configuration that knows what deployment costs.

Every SKU carries its real installed cost — parts, civil work, crew hours, truck rolls — pulled from your ERP and field system, per territory. Configure the job and the cost stack builds itself.

  • Installed cost per SKU, per territory — not a national average
  • Crew hours and truck rolls priced from executed jobs
  • Bill-of-materials validated against live inventory
See the Cost Engine →
Cost Engine · Campus Eastlive
Hardware$21.6K
Civil work$11.4K
Labor$6.8K
Service$2.6K
Installed cost · 12 sites$42,350
Step 02 · Price

The floor holds. Every time.

Margin Protect scores the price against your cost floor before anything leaves the building. Drop below it and the Margin Scorer vetoes — the quote is blocked, not flagged for someone to notice later.

  • Cost-floor enforcement with a hard veto, not a warning
  • Discount creep attributed to the SKU, crew, and rep
  • Competitive benchmarks and contract terms read in
See Margin Protect →
Margin Protect · guardrailfloor 28.0%
Floor · 28.0%
⨯ Vetoed · below floor
Q1
Q2
Q3
Q4
Q5
Q6
Above floor · issued Below floor · blocked
Step 03 · Quote

Signal to signed, in one pass.

The approved quote ships itself: a deal room with the terms, the schedule, and e-sign — then writes the executed contract straight back to your CRM as the new source of truth.

  • Deal rooms generated with terms and schedule attached
  • E-sign, then the executed contract re-enters the spine
  • Every win and loss retrains the next score
See the Deal Room →
Quote pipeline · Apex Networks38ms
1Signal ingestedERP cost · FSM job · contract4ms
2Swarm scores4 agents vote · Pulse 9211ms
3Floor enforced34.2% · +6.2 pts headroom6ms
4Quote issued$42,350 · 14 SKUs9ms
5Deal room + e-signwritten back to CRM8ms
The primitive · Agentic swarm

One number. Four agents. Any of them can veto.

The Pulse is a composite score per account — continuously recomputed by four specialized agents. The UI is the transcript of their argument.

Margin Scorer realized rag · floor EV Projector ltv × retention Risk Detector concentration Expansion unbuilt addresses 92 PULSE ⨯ MARGIN VETO · QUOTE BLOCKED
Margin Scorer
Realized-margin RAG, cost-floor enforcement, per-address rollup.
EV Projector
LTV × retention probability × location expansion curves.
Risk Detector
Portfolio and supply concentration, anomaly detection.
Expansion Surfacer
Unbuilt-address inference, multi-site readiness, renewal timing.
— Say it again

The install teaches the invoice.

Margin teaches targeting.

The fleet is the forecast.

Your inventory knows more than your CRM.

The quote is the last step, not the first.

Price what you can actually deliver.

Category · ABM × CPQ for physical revenue

Legacy CPQ prices the ambition. We price the asset.

DimensionLegacy CPQAllometry
Data rootAccount → OpportunityLocation → Asset → Pulse
Cost modelStatic price bookLive ERP + FSM cost
Margin visibilityMonth-endContinuous · per address
GuardrailsApproval workflowHard agent veto
Quote volumeRep-limited50+ / day autonomous
DeploymentReplaces your stackSits on CRM · ERP · FSM
Integrations · Read-and-write

We don't replace your stack. We underwrite it.

Allometry reads cost, contract, and field truth from the systems you already run — and writes scores, quotes, and next-best-action back into them.

CRM Salesforce ERP NetSuite FSM ServiceTitan CRM HubSpot ERP SAP S/4HANA FIN Sage Intacct PM Procore DW Snowflake
DW Databricks FIN QuickBooks CRM Dynamics 365 FLEET Samsara FLEET Fleetio SIGN DocuSign PAY Stripe MSG Twilio
The operating system · eight motions · six flagships
Design-partner rollout

Put the floor in front of the quote.

Send us one territory and your cost model. We'll score a live cohort of your accounts, price a real quote against your actual floor, and show you where the margin was leaking.

Book a demo → Back to the Price loop 30 min · no data prep