Home· Deploy· Deployment Design
Deployment Design · M.03

From site walk to permitted in hours.

CAD-grade output that engineering can sign off on. Permit-ready package the AHJ won't kick back. Cost model and crew handoff baked into the same source. One design, three outputs, zero translation.

design.export · 1287 Pine St PERMIT-READY · STAMP OK
Charlotte, NC · 7.2kW solar + ESS · single-line + site plan
94% · designs build as drawn
setbacks · 3' fire access
code: NC NEC 690.12
PASS
conduit run · 22ft EMT 3/4
snap-to-spec
VALID
structural calcs
load: 3.2psf · within
PASS
BOM cost · live
via Cost Engine
$8,420
engineer stamp
M. Chen, PE · 12:14
SIGNED
Live · the schedule fill empty week · 22 jobs placed by the optimizer · live · 18s loop
MON TUE WED THU FRI 08:00 15:00 22 JOBS PLACED · 11% TIME SAVED VS HEURISTIC
▸ Vault deposit
What this guardrail produces
▸ 12 mo in vault → first tier unlocked
▸ Evidence
Capacity utilization · time-series of throughput · forward capacity commitment
▸ Tier unlocked
Tier 1 · banksTier 2 · infra debt
Guardrail rule: every schedule version retained with optimizer rationale — see /the-vault for the full underwriting fabric.
What it looks like

Plan. Render. Send.

Drag-and-drop layout. AI render generation. One-click export to deal room or proposal.

§ 01 · Floorplan

2,400 sf · 14 equipment placed

Plateau retrofit · Operator G
§ 02 · AI render

Generated in 1.4s

v3 render · main floor
[ rendered scene ]
§ 03 · One-click export

Three formats, one click

Export DS-2024-118 to…
Deal Room
Landlord brochure (PDF)
Inline in quote
The problem

The design that wins the deal isn't the design that gets built.

Sales designs in PowerPoint, engineering redoes it in CAD, the AHJ kicks it back, and the crew builds something else. Deployment Design collapses that chain.

Without Deployment Design

Today's status quo

  • Sales designs in PPT or Canva — wrong scale, wrong components, wrong cost basis
  • Engineering rebuilds in CAD from scratch — 2-3 week cycle per deal
  • AHJ kicks the design back for setbacks, fire access, equipment clearance
  • Crew rebuilds in the field; what's installed bears no resemblance to what was sold
With Deployment Design

What changes

  • Sales designs in a constraint-aware editor — every component snaps to a real spec
  • Engineering reviews and signs — CAD output is the source, not a copy
  • Permit-ready package — setbacks, signs, and clearances enforced at design time
  • What was sold is what the AHJ approves is what the crew builds
Capabilities

What's inside.

The six capabilities that make this module work end-to-end. Pick any one as your starting point — they compound.

01

Constraint-aware editor

Components, conduits, equipment — every drop-in respects clearance, code, and capacity. Rule violations flagged at design time, not site time.

CAD · Rules · Codes
02

Site-data import

LiDAR, drone scans, satellite imagery, parcel data — all importable as a base. Design on top of the actual site, not a stylized drawing.

LiDAR · Drone · GIS
03

Cost-aware components

Every component carries its cost (from Cost Engine) and install hours (from job-costing data). Design changes update margin in real time.

Cost · BOM · Margin
04

Permit-pack export

Single-line, three-line, site plan, equipment list, structural calcs — exported as the AHJ-specific package on request.

Permit · AHJ · Export
05

Engineering review

Designs route to the licensed engineer for stamp. Comments, redlines, and the audit trail of who approved what — all in-app.

Stamp · Review · Trail
06

Field handoff

What ships to the crew is the same canonical design — same BOM, same drawings, same install instructions. No translation, no drift.

Crew · BOM · Handoff
The autonomous loop

One source. Three outputs.

From the address, the design surfaces the site. From the design, three packages export at once: AHJ-specific permit, BOM-costed proposal, crew-facing job package. Same source. No drift.

§ 01 · Site

Pull base data

Parcel, satellite, LiDAR, AHJ rules — loaded with real geometry and real codes.

< 30s
§ 02 · Drop

Snap to spec

Components carry cost, install hours, code constraints. Violations flag immediately.

Realtime
§ 03 · Stamp

Engineer review

Routes to licensed PE for stamp. Comments, redlines, version history all in-app.

Same day
§ 04 · Export

3 packages

Permit pack to AHJ. Costed BOM to sales. Crew package to field. One source.

1-click
Policy you can read

Site rules baked in.

Each AHJ has its own rule set — setbacks, fire access lanes, equipment clearance, signage. Deployment Design knows them all. Drop a panel where the local code says you can't, and the editor blocks the placement at design time.

1,400+ jurisdictions modelled. New rules ingest as AHJs publish them. Your design always reflects today's code, not last year's.

ahj · charlotte-nc.alm
# AHJ Rule Set · Charlotte-Mecklenburg, NC
jurisdiction "charlotte-mecklenburg-nc":

  # NEC 2023 base + local amendments
  base_code = "NEC-2023"
  amendments = ["CM-AMD-2024-04"]

  # solar PV setbacks
  rule fire_access:
    setback_ft = 3            # 3' from ridge
    apply_to = ["residential"]

  rule rapid_shutdown:
    require "NEC-690.12-compliant"
    label_inverter = true

  rule esS_clearance:
    setback_ft = 3             # 3' from windows
    setback_door_ft = 5

  # permit pack template
  permit_template = "CM-PV-RES-2024"
  reviewer_email = "permits@..."
Where it lives

Plugs into the field stack you already have.

Site data

Imagery + parcel

Nearmap, EagleView, Google — refreshed on capture cadence.

CAD

DWG / DXF / PDF

Native export to AutoCAD-compatible formats. Engineering stays in their tools.

Permit

AHJ submission

1,400 jurisdictions modelled. Permit packs in the AHJ's preferred format.

Field

Crew handoff

Job package syncs to ServiceTitan, FieldEdge, native crew app.

Real outcomes

"Permit-ready packages used to take 6 weeks. Allometry's deployment-design module turned them around in 11 days. We won 4 sites in Q2 we'd have lost on the timeline alone."

COO · Confidential design partner · pallet manufacturing
11dPermit-ready vs 6 weeks
4Sites won on timeline edge
88%First-pass-yield · RFPs
Confidential design partner · case study Pallet manufacturing · Quebec · 400+ customer addresses
See it on your data

Bring an address.

We'll design it, cost it against your stack, render the permit pack, and route it for engineering stamp — all in one session, on your data.